Beamline Status
Beamline
Date
(mo/da/yr)
Description
Common
BL1-5
9/26/08
Crystal screening.
BL7-1
BL9-1
BL9-2
BL11-1
BL12-2
6/17/09
Current Operating Mode: 6.6 - 17 KeV; vertical beam: 20-200 microns; horizontal beam: 70-200 microns; vertical stability over 1 hr: 0.4 microns RMS; high-speed phi axis; MAR325 CCD, remote access, time-slicing with microcrystal and Pixel Array Detector (PAD) commissioning.
BL14-2
9/26/08
Construction phase.